JinkoSolar Photovoltaic ModuleUser Manual (UL1703)
8 modules are attached to a permanent structure, PV modules should be tilted so that the energy production from the PV modules will be maximized on
10 Figure3 above: PV module installed at long side with Clamp fitting method Module type Cell type Cell quantity Dimension(mm) A*B J K M
12 Jinko modules can be grounded using third party ground washers or clip devices ( JKMXXXM-72 , JKMXXXP-72 , JKMXXXM-60 , JKMXXXP-60 Use Tyco :19
14 6. Disclaimer of Liability Because the use of the manual and the conditions or methods of installation, operation, use and maintenance of p
16 7. Contact us Jinko Solar Co., Ltd. (Shanghai Office) 16F, Building No.2, 428# South Yang Gao Road, Shanghai, China Postcode: 200127 Tel :(86
16F, Building No.2428# South Yang Gao Road,Shanghai, China 200127Tel: +86 21 6061 1799Fax: +86 21 6876 1115www.jinkosolar.com | Technic Support: tec
Contents 1 General Information2. Installation12235566778910111313141.1 Overview1.2 Applicable Products1.3 Warnings2.1 Installation safety2.2 Inst
1 1. General Information 1.1 Overview Thanks for choosing Jinko Solar PV modules. In order to ensure the PV modules to be installed correctly, pl
2 inverters. The maximum permitted system voltage (DC) of the modules(UL 1000V series) sold in America and Canada is 1000V. And the maximum permitt
4 All instructions should be read and understood before attempting to install, wire, operate and maintain the module. Please don‟t lift up PV
6 module, that will damage the module and would be dangerous for personal safety. 2.2 Installation Condition 2.2.1 Climate condition
Commentaires sur ces manuels